Wall Protection Technology with Saltwater Mud in Borehole CY-1
DOI:
Author:
Affiliation:

No.4 Team of Hydrogeology and Engineering Geology, Hebei Provincial Bureau of Geo-exploration and Mineral Development,No.4 Team of Hydrogeology and Engineering Geology, Hebei Provincial Bureau of Geo-exploration and Mineral Development,No.4 Team of Hydrogeology and Engineering Geology, Hebei Provincial Bureau of Geo-exploration and Mineral Development,No.4 Team of Hydrogeology and Engineering Geology, Hebei Provincial Bureau of Geo-exploration and Mineral Development,No.4 Team of Hydrogeology and Engineering Geology, Hebei Provincial Bureau of Geo-exploration and Mineral Development

Clc Number:

P634.6

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In drilling construction of borehole CY-1 in a salt mine of Hebei, wall protection by mud was a technical difficulty. According to the different construction conditions, sublevel mud scheme was adopted to ensure construction safety and quality. The practice shows that this wall protection technology is feasible. The paper introduces the wall protection technology with saltwater mud in borehole CY-1.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 06,2013
  • Revised:February 06,2013
  • Adopted:April 27,2013
  • Online: June 25,2013
  • Published: