Technology of Drilling Construction in a Pb-Zn Mining Area
DOI:
Author:
Affiliation:

No.1 Institute of Geological

Clc Number:

P634.5

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to the drilling difficulties in Liuguan Pb-Zn mining area in Henan, by optimizing borehole structure and putting retrievable casing in the upper complex hole section, the construction schedule was accelerated; with low pressure and slow speed wire-line coring hydro-hammer technology, the obvious effects of drilling deviation control and less borehole curvature were received, the construction quality and success rate were improved. Based on the field analysis,mud formulation was constantly adjusted and inert leaking stoppage material was added to different loss zones. A set of wall protection and leaking stoppage technology suitable for the complex formation of this mining area was developed.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 20,2013
  • Revised:March 13,2013
  • Adopted:May 06,2013
  • Online: June 25,2013
  • Published: