Dewatering for Deep Foundation Pit and Well Sealing for Dewatering Well with Confined Water Head
DOI:
Author:
Affiliation:

Qingdao Deep Foundation Reinforced Engineering Co., Ltd.,China Construction Eight Engineering Division Corp., Ltd., Qingdao Branch Company,Qingdao Deep Foundation Reinforced Engineering Co., Ltd.

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    For deep foundation pit construction, if in the condition of shallow buried underwater confined water, the tube well is applied to lower underground water level and different measures are taken for well sealing to ensure the underground water level to be controlled within the scope of the construction requirements. The paper introduces the dewatering construction for deep foundation pit in a project of Shandong and the relative well sealing plan as well as the construction process for the relief well with confined water head.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 08,2013
  • Revised:May 08,2013
  • Adopted:September 25,2013
  • Online: January 02,2014
  • Published: