Practice of φ3m Anti-slide Pile Construction for the Protection Engineering in Meiziping Town
DOI:
CSTR:
Author:
Affiliation:

Sichuan Zhunda Geotechnical Engineering Co., Ltd.,Sichuan Zhunda Geotechnical Engineering Co., Ltd.,Sichuan Zhunda Geotechnical Engineering Co., Ltd.,Sichuan Zhunda Geotechnical Engineering Co., Ltd.,总工程师

Clc Number:

TU75

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The paper briefly introduces the main difficult points and technical measures for the construction of φ3m anti-slide pile in Meiziping town of Guandi reservoir, which can be the important references to the similar large diameter pile foundation construction.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 09,2013
  • Revised:September 07,2013
  • Adopted:September 16,2013
  • Online: October 29,2013
  • Published:
Article QR Code