To verify the sampling effects of YGL-S100 sonic drill in complex strata, the drilling experiment was carried out on the deep overburden layer where Xiangjiaba hydropower station is located. The paper expounds the technical characteristics of YGL-S100 sonic drill, various parameters and the construction technology in the drilling process.