Discussion of Several Problems in Ultra-deep Underground Continuous Wall Construction
DOI:
Author:
Affiliation:

Wuhan Geological Prospecting & Foundation Engineering Co., Ltd.,Hubei Geology & Mineral Resources Construction Engineering Group Co., Ltd.

Clc Number:

TU476 .3

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on an underground continuous wall construction project in Wuhan, this paper discusses difficulties caused by three-axis mixing pile construction in the ultra-deep rock-socketed underground continuous wall and in the joint pipe installation and drawing with corresponding solution measures. The practice proves that these measures are effective and can be reference for similar engineering in wuhan.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 19,2013
  • Revised:May 19,2013
  • Adopted:October 09,2013
  • Online: November 29,2013
  • Published: