Practice of Quality Accident Treatment for High Pressure Bored Pile Foundation
DOI:
Author:
Affiliation:

Yichang Geological Survey and Exploration Party of Hubei Province,Geology and Minerals Survey Bureau of Northwest Hubei Province

Clc Number:

TU473.1 4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper analyzes the causes of quality accident of high pressure bored pile foundation of a comprehensive building in Xiangyang and introduces the treatment scheme, which is the composite foundation of the original borehole grouting pile and soil between piles with new CFG pile. The practice shows that the scheme is feasible and effective.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 22,2013
  • Revised:May 22,2013
  • Adopted:August 05,2013
  • Online: September 03,2013
  • Published: