Abstract:The formation characteristics of Longdong coalfield region are described, and based on the analysis on the main factors influencing the drilling construction, the drill bit diameter increasing, the borehole structure optimizing, the suitable drill bit for rock optimally selecting, mud system improving and other supporting technologies were adopted. The paper focuses on the prevention and treatment of the adhesive sticking drill accident.