Application and Research on Driving Anchor Tube in High Filling Slope
DOI:
CSTR:
Author:
Affiliation:

Henan Provincial Coalfield Geology Bureau,North China University of Water Conservancy and Electric Power,North China University of Water Conservancy and Electric Power

Clc Number:

P642.22

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In a treatment of high filling slope, it was difficult for hole construction with traditional methods, driving anchor tube method was adopted, which is well adapted to soil layers. Based on the numerical stimulation analysis on the reinforcement mechanism of high filling slope by driving anchor tube, the stress, displacement and plastic district are analyzed, finally the specific construction technology of driving anchor tube was given, which could be the reference for similar engineering.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 31,2013
  • Revised:May 31,2013
  • Adopted:July 15,2013
  • Online: October 29,2013
  • Published:
Article QR Code