Analysis on the Process of Fill Landslide Treatment in a Natural Gas Well Site and the Effect Evaluation
DOI:
CSTR:
Author:
Affiliation:

Institute of Exprolation Technology, CAGS,PetroChina Southwest Oil and Gas Field Company,PetroChina Southwest Oil and Gas Field Company Northeast Sichuan Gas District

Clc Number:

P642.22

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    A gas well site is located in a fill platform, the landslide disaster occurred for 3 times, because the soil filling was not consolidated when the construction was started. The treatment solutions for 3 landslides were ground drainage grouting reinforcement anti-slide pile, the anti-slide pile retaining wall reinforcement and micro combination anti-slide pile Based on the characteristics of landslide in the natural gas well fill, the treatment engineering and the effects are analyzed, and the action effects of micro combination anti-slide pile technology used in this landslide treatment is especially analyzed.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 25,2013
  • Revised:June 25,2013
  • Adopted:July 07,2013
  • Online: August 02,2013
  • Published:
Article QR Code