Study on Mechanism of Reducing Core Blockage in Hydro-hammer Drilling
DOI:
Author:
Affiliation:

Institute of Exploration Technology, CAGS,Faculty of Engineering, China University of Geosciences

Clc Number:

P634.5 6

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    By the force analysis on core barrel in hydro-hammer coring drilling process, this paper discusses the action mechanism of reducing core blockage in hydro-hammer drilling. In addition, the applicable stratum range for hydro-hammer drilling are clarified and the results achieved during the drilling operation for the hole WFSD-4 of Wenchuan earthquake fault scientific drilling project are introduced.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 26,2013
  • Revised:June 26,2013
  • Adopted:July 09,2013
  • Online: August 02,2013
  • Published: