Analysis oo Core Blockage Mechanism in the Core Drilling Operation of Wenchuan Earthquake Fault Scientific Drilling Project
DOI:
Author:
Affiliation:

Institute of Exploration Technology, CAGS,Institute of Exploration Technology, CAGS,Institute of Exploration Technology, CAGS

Clc Number:

P634.5

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    By the analysis on core blockage mechanism with split core barrel for the coring operation of the borehole No.4 of Wenchuan Earthquake Fault Scientific Drilling Project, the paper summarized 4 core blockage forms. Some technical measures to reduce core blockage are suggested for each type of the core blockage form.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 26,2013
  • Revised:June 27,2013
  • Adopted:July 10,2013
  • Online: August 02,2013
  • Published: