Determination of Dynamic Compaction Construction Process with Gravel Soil Backfill and the Design Optimization
DOI:
Author:
Affiliation:

No.5 Geological Party, Jiangsu Bureau of Geology and Mineral Exploration,No.5 Geological Party, Jiangsu Bureau of Geology and Mineral Exploration,No.5 Geological Party, Jiangsu Bureau of Geology and Mineral Exploration,No.5 Geological Party, Jiangsu Bureau of Geology and Mineral Exploration,No.5 Geological Party, Jiangsu Bureau of Geology and Mineral Exploration,No.5 Geological Party, Jiangsu Bureau of Geology and Mineral Exploration

Clc Number:

TU472.3

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    By the case of tamping test of dynamic compaction ground treatment with gravel and soil backfill in Laiwu 1000MW class power unit of Huaneng power plant, the construction quality difference and the treatment effects in 2 trial tamping areas with different construction processes are compared. On this basis, the construction quality, effective consolidation depth, soil compactness, deformation parameters and bearing capacity of the ground are found. According to the field tamping and backfill depth, the pre-placed depth and corresponding construction process are selected to determine the final construction plan for the further improvement of effect in dynamic compaction ground treatment, which provides an effective basis for large-area dynamic compaction with backfill and the finalized construction process.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 26,2013
  • Revised:November 01,2013
  • Adopted:October 24,2013
  • Online: November 29,2013
  • Published: