Comprehensive Construction Technology for Ajialing Tunnel Passing the Existing Railway
DOI:
Author:
Affiliation:

The Third Geological Brigade of Liaoning Province,The Third Geological Brigade of Liaoning Province,The Third Geological Brigade of Liaoning Province,The Third Geological Brigade of Liaoning Province

Clc Number:

U455

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Ajialing tunnel was planed passing the existing railway. By the comprehensive control technology of pre-support with cavern pipe shed, settlement feedback excavation method, primary support strengthening, monitoring measurement technology and monitoring on cavern pipe shed deformation, the settlement of the existing railway is effectively controlled. According to the tunnel construction conditions, this comprehensive technology breaks through the conventional construction methods and process, and provides the reference for the similar tunnel construction.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 18,2013
  • Revised:September 18,2013
  • Adopted:November 04,2013
  • Online: November 29,2013
  • Published: