Construction Practice of Water Intake Engineering near the Reservoir
DOI:
Author:
Affiliation:

Zhengzhou Institute of Geological Engineering Investigation of Henan Province,Zhengzhou Institute of Geological Engineering Investigation of Henan Province,Zhengzhou Institute of Geological Engineering Investigation of Henan Province,Zhengzhou Institute of Geological Engineering Investigation of Henan Province,Zhengzhou Institute of Geological Engineering Investigation of Henan Province

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To meet the water supply demand of a power plant, the water intake engineering construction (containing water intake shaft, draw water tunnel and open diversion channel) at a reservoir was needed. By means of the top-down method of excavation with lining alternated in short segments, guiding cavern water from shaft wall was derived as a part of the water source, and the shaft construction was completed with dry bottom-sealing. By pipe jacking and pipe top grouting technologies, draw water tunnel was accomplished in the strata with broken rocks and abundant water inflow; by the rock plug blasting, the connection of the tunnel and the reservoir was successfully realized; and by percussive trenching technology, open diversion channel was constructed.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 17,2013
  • Revised:October 17,2013
  • Adopted:December 24,2013
  • Online: February 26,2014
  • Published: