Practice of Cluster Wells Drilling in AT9 Well Area of Tahe Oilfield and the Understanding
DOI:
Author:
Affiliation:

Shengli Drilling Technology Research Institute of SINOPEC,Engineering Technology Institute of Sinopec Northwest Oilfield Company,Engineering Technology Institute of Sinopec Northwest Oilfield Company,Shengli Drilling Technology Research Institute of SINOPEC,Huanghe Fifth Drilling Company, SINOPEC Shengli Petroleum Engineering Co., Ltd.

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to the geological engineering difficulties in AT9 well area and the special requirement of anti-bumping in the straight section of cluster wells, the designs of well location, platform layout, borehole trajectory and well structure are optimized. The paper introduces the key techniques of MWD anti-bumping, PDC straight spiral rod composite drilling and drilling fluid in drilling process, analyzes the technical rationality and the development economy of cluster well group and verifies the applicability of the cluster drilling technology in AT9 well area.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 24,2013
  • Revised:November 29,2013
  • Adopted:December 04,2013
  • Online: January 02,2014
  • Published: