Drilling Technology of JK-1 Deep Hole at Deep Exploration Experimental Base in Xingcheng of Liaoning
DOI:
Author:
Affiliation:

Jilin Institute of Geology Technical Equipment,Jilin Institute of Geology Technical Equipment,College of Construction Engineering, Jilin University,College of Construction Engineering, Jilin University,,Beijing Geological Engineering Co., Ltd., Tianjin Branch Company,College of Construction Engineering, Jilin University,College of Construction Engineering, Jilin University

Clc Number:

P634.5

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to verify the research results of field geological exploration and geophysical prospecting, 4 holes, more than 1500 meters in depth, were constructed at deep detecting experimental base in Xingcheng of Liaoning Province. The design depth of JK-1 is 1800 meters, but its actual depth is 1750 meters. By drilling through the basement of Yangjiazhangzi synclinal basin, the complete core of North China type Paleozoic strata in western Liaoning Province was achieved. The quality indexes of recovery rate and borehole verticality have reached high quality requirements. The smooth implementation of JK-1 will provide technical support for the subsequent drilling construction.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 09,2014
  • Revised:January 09,2014
  • Adopted:January 13,2014
  • Online: March 27,2014
  • Published: