Measures to Ensure the Construction Quality of CSM Method
DOI:
Author:
Affiliation:

Tianjin Geological Foundation Engineering Company,Tianjin Binhai City Investment and Development Co., Ltd.

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    CSM Method, that is double wheel milling deep mixing technology, is a new type of technology. A good job of the cement soil quality control and the related preparation work should be done to ensure the construction quality of CSM method before the construction. In construction process, the trenching verticality, cement in cement slurry, water cement ratio and grouting volume, milling drilling speed and double wheel revolution, overlapping length and quality of structural steel inserting must be under control.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 10,2014
  • Revised:March 14,2014
  • Adopted:March 06,2014
  • Online: June 26,2014
  • Published: