Construction of 2-1 Salt Well in Ningjin-Xinji Exploration Area
DOI:
Author:
Affiliation:

The Second Geological Team of Hebei Provincial Bureau of Coalfield Geology,The Second Geological Team of Hebei Provincial Bureau of Coalfield Geology

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Due to the core drilling depth increasing with more auxiliary work time, improvement of round trip efficiency is imperative. Without large scale of drilling equipments renewal, according to the difficulties in salt rock coring in Ningjin-Xinji exploration area, the supporting research was made on optimization of well program, rapid drilling in non coring section, salt water drilling fluid system and safe coring in salt rock layer, which was successfully applied in the field practice.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 17,2014
  • Revised:April 28,2014
  • Adopted:May 27,2014
  • Online: July 28,2014
  • Published: