Key Technology of Drilling for Yuanye HF-1 Shale Gas Horizontal Well
DOI:
CSTR:
Author:
Affiliation:

Drilling Technology Research Institute, Shengli Petroleum Engeering Co., Ltd., SINOPEC,Drilling Technology Research Institute, Shengli Petroleum Engeering Co., Ltd., SINOPEC,中石化胜利分公司胜利采油厂

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Yuanye HF-1 is the first shale gas pre-exploration horizontal well in Yuanba block of Northeastern Sichuan. Based on the analysis on the difficult points in engineering geology, the third spud section structure was optimized; rational drilling method, drilling fluid system and drilling process measures are selected to form a set of shale gas horizontal well drilling technical scheme suitable for this area. The well is drilled to the objective layer with drilled depth of 4982m, horizontal displacement of 1421.73mm, drilling cycle of 168.88d, average penetration rate of 3.07m/h and the three open well diameter enlargement ratio is only 4.82%.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 07,2014
  • Revised:May 07,2014
  • Adopted:May 28,2014
  • Online: August 26,2014
  • Published:
Article QR Code