Practice of Grouting Sealing for the Well under Gate Base
DOI:
Author:
Affiliation:

Henan Provincial Environment Planning & Designing Co., Ltd.,Henan Provincial Environment Planning & Designing Co., Ltd.,Hainan University,Henan Provincial Environment Planning & Designing Co., Ltd.

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Equipment well should be built under the pocket floor for the installation of monitoring equipments, while sandboils and waterspouts often occur in the construction and running process because of lax sealing. The paper introduces the system design of grouting cementing for the well under pocket floor and the construction process; discusses the grouting pressure of lateral extrusion grouting, water-cement ratio and grouting measures and analyzes the grouting principle and effects.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 15,2014
  • Revised:March 15,2014
  • Adopted:May 12,2014
  • Online: July 28,2014
  • Published: