Finite Element Analysis on Static Strength of Truck-mounted Workover Rig Derrick
DOI:
CSTR:
Author:
Affiliation:

Xi’an Research Institute of China Coal Technology & Engineering Group Corp

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Conventionally, the influence of guy wire and wind load on derrick was often ignored in the static strength analysis on derrick of truck-mounted workover rig, but it does not accord with the actual working conditions. This paper made the finite element analysis on a derrick of truck-mounted workover rig through ABAQUS software. Under different static hock loads and wind loads, the maximum static hock load the derrick can bear was obtained and the weak point position on derrick was determined. Based on the calculation, the cable-stayed range of guy wire was reasonably shortened.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 01,2014
  • Revised:July 02,2014
  • Adopted:August 05,2014
  • Online: November 13,2014
  • Published:
Article QR Code