Waterstop Scheme for Deep Well with Large Water Level Difference and the Analysis on Its Implementation Effect
DOI:
Author:
Affiliation:

Shanxi Province No.3 Institute of Hydrogeology and Engineering Geology Investigation,Shanxi Province No.3 Institute of Hydrogeology and Engineering Geology Investigation

Clc Number:

TU991.12

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    With the engineering case of waterstop scheme for a deep well with large water level difference and the implementation effect, the detailed analysis is made on in-tube grouting, out-tube grouting, liner tube cementing, the same diameter cement bridging and pressure relief drilling methods and the experience is summarized.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 02,2014
  • Revised:June 02,2014
  • Adopted:November 18,2014
  • Online: January 07,2015
  • Published: