Technical Exploration of Pumping Test Process in Deep Hydrogeological Hole
DOI:
Author:
Affiliation:

No.5 Institute of Geo-exploration of Henan,China University of Geosciences

Clc Number:

P641.7

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Take the example of ZK2208 in detailed survey project of Yuzhou of Henan Province, with rational well drilling structure, water stop by different diameter casings, well washing by sodium pyrophosphate and CO2, casing pulling for long term observation hole with drill and jack, the difficulties of casing running, one trial effective water stop, effective well washing and smooth casing pulling have been overcome, a deep hydrogeological hole of more than 1300m in depth has been completed according to the geological design and related regulations.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 23,2014
  • Revised:April 15,2015
  • Adopted:May 06,2015
  • Online: June 01,2015
  • Published: