Discussing of Deep Hole Drilling Construction in Fujian Coalfield
DOI:
Author:
Affiliation:

121 Geological Team in Fujian Province

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The geological structure is complex in Fujian coalfield with fault development, fractured and loose rock formations and thin sheet or muddy mudstone by being extrusion, which cause many difficulties for drilling; such as mud shale hydration expansion and severe hole collapse led by hole wall instability, etc. By the use of wire-line core drilling technology, optimum the diamond bit and scientific ratio of mud and drilling parameters, the technical difficulties in holes were successfully solved. The drilling efficiency is improved and the production cost is reduced.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 07,2014
  • Revised:July 08,2015
  • Adopted:July 22,2015
  • Online: September 07,2015
  • Published: