Abstract:In the construction of 3 large diameter hydrogeology holes in Caosiyao molybdenum mine, normal construction by conventional core drilling with reducing diameters after upper large diameter drilling, borehole verticality ensuring in the large diameter hole construction and the borehole of designed depth being smoothly completed with prohibition of polymer plugging material in hydrogeology hole construction were all realized. The paper introduces the related technical measures.