Construction Technology of Large Diameter Hydrogeology Holes in Caosiyao Molybdenum Mine
CSTR:
Author:
Affiliation:

No.514 Geological Party of North China Bureau of Geology for Metal Resources Exploration

Clc Number:

P634

  • Article
  • | |
  • Metrics
  • |
  • Reference [5]
  • |
  • Related [7]
  • | | |
  • Comments
    Abstract:

    In the construction of 3 large diameter hydrogeology holes in Caosiyao molybdenum mine, normal construction by conventional core drilling with reducing diameters after upper large diameter drilling, borehole verticality ensuring in the large diameter hole construction and the borehole of designed depth being smoothly completed with prohibition of polymer plugging material in hydrogeology hole construction were all realized. The paper introduces the related technical measures.

    Reference
    [1] 刘广志,金刚石钻探手册[M]。北京:地质出版社,1991.
    [2] 郑思光,赵志杰,李志强,司家营铁矿中深孔复杂地层岩心钻探施工技术[J] ,探矿 工程(岩土钻掘工程),2010,37(2):24-26.
    [3] 薛凡忠,杨军国,王占芳,大口径水文地质孔扩孔埋钻事故的处理及预防措施[J],探矿 工程(岩土钻掘工程),2013,40(5):31-34
    [4] 刘维平,郑秀华,谢博,微泡沫钻井液研究及其在黄金勘探中的应用[J],探矿工程(岩 土钻掘工程),2011,38(3):13-16
    [5] 曾令强,张武,李海明,秦沛,大口径深井取心钻进活动套管技术方法的探讨[J],探矿 工程(岩土钻掘工程),2014,41(2):13-17
    Cited by
    Comments
    Comments
    分享到微博
    Submit
Get Citation
Share
Article Metrics
  • Abstract:1112
  • PDF: 1127
  • HTML: 220
  • Cited by: 0
History
  • Received:October 10,2014
  • Revised:January 30,2015
  • Adopted:April 17,2015
  • Online: June 01,2015
Article QR Code