Construction Technology of Large Diameter Hydrogeology Holes in Caosiyao Molybdenum Mine
DOI:
CSTR:
Author:
Affiliation:

No.514 Geological Party of North China Bureau of Geology for Metal Resources Exploration

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In the construction of 3 large diameter hydrogeology holes in Caosiyao molybdenum mine, normal construction by conventional core drilling with reducing diameters after upper large diameter drilling, borehole verticality ensuring in the large diameter hole construction and the borehole of designed depth being smoothly completed with prohibition of polymer plugging material in hydrogeology hole construction were all realized. The paper introduces the related technical measures.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 10,2014
  • Revised:January 30,2015
  • Adopted:April 17,2015
  • Online: June 01,2015
  • Published:
Article QR Code