Grouting Reinforcement for Mined-out Area Underlying Substation in Datong
DOI:
Author:
Affiliation:

217 Geological Team, Shanxi Province Baream of Geology Exploration

Clc Number:

TU472

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the case of the treatment for mined-out area underlying a substation in Datong, the paper introduces the selection and implementation processes of the treatment methods for mined-out area treatment, discusses the design idea of the grouting reinforcement engineering and summarizes the solutions for various difficulties encountered in the construction with the successful experience presented.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 17,2014
  • Revised:November 28,2014
  • Adopted:December 05,2014
  • Online: January 07,2015
  • Published: