Application of Drilling with Full Casing (Benote Method) in Cobble-Boulder Stratum in Xi’an-Chengdu High-Speed Rail
DOI:
CSTR:
Author:
Affiliation:

The Institute of Exploration Techniques, CAGS,The Institute of Exploration Techniques, CAGS,The Institute of Exploration Techniques, CAGS,Sichuan Road DdDd Bridge Group Co., Ltd.

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The bridge pile is bored grouting one for Qingjianghe super large bridge of Xi’an-Chengdu high-speed rail; borehole drilling was difficult because of the cobble-boulder stratum crossing which seriously restricted the time limit for the project. In view of this circumstance, drilling with full casing and rotary drilling rig with casing oscillator were adopted to solve the difficulties of pile construction in cobble-boulder stratum.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 02,2014
  • Revised:December 02,2014
  • Adopted:April 27,2015
  • Online: June 01,2015
  • Published:
Article QR Code