Exploration of Water-stop Curtain Wall for Deep Foundation Pit in Complex Conditions
DOI:
CSTR:
Author:
Affiliation:

No.3 Geological Exploration Institute, Henan Provincial Bureau of Geo-exploration and Mineral Development,No.3 Geological Exploration Institute, Henan Provincial Bureau of Geo-exploration and Mineral Development,No.3 Geological Exploration Institute, Henan Provincial Bureau of Geo-exploration and Mineral Development

Clc Number:

TU473.2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The design depth of water-stop curtain wall was 34.6m under natural ground with complex surrounding environment and geological conditions. Based on the comprehensive analysis, various construction processes were explored. Three axis mixing cement pile water-stop curtain wall were constructed on the east, west and south sides and high rotary jet grouting water-stop curtain wall was used on north side. The unfavorable factors of narrow site, complex geological conditions and environment were overcome with good water-stop effect.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 16,2014
  • Revised:April 03,2015
  • Adopted:April 07,2015
  • Online: July 03,2015
  • Published:
Article QR Code