Drilling Technology for AKT1-1 Geothermal Well in Wenquan County of Xinjiang
DOI:
CSTR:
Author:
Affiliation:

No.1 Hydrogeology & Engineering Geology Exploration Team of Xinjiang Geology & Mineral Bureau,No.3 Exploring Institute of Geo-Mineral Resources,No.3 Exploring Institute of Geo-Mineral Resources,No.1 Hydrogeology & Engineering Geology Exploration Team of Xinjiang Geology & Mineral Bureau,No.3 Exploring Institute of Geo-Mineral Resources

Clc Number:

P634;TE249

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to the difficult conditions of complex formations, much bed crack and serious water inflow in the construction of AKT1-1 geothermal drilling hole in Wenquan County of Xinjiang, the borehole structure design, drilling equipment selection, drilling tool gradation selection, new drilling process and flushing fluid preparation are summarized in this paper and corresponding drilling technologies and countermeasures are put forward to accumulate the construction experience for deep geothermal drilling in this region.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 23,2014
  • Revised:June 21,2015
  • Adopted:July 16,2015
  • Online: September 07,2015
  • Published:
Article QR Code