Construction Technology of Screw Directional Deviation Correction for Deep ZK5407 in Zhuxi Mining Area of Jiangxi
DOI:
Author:
Affiliation:

912 Brigade, Jiangxi Province Bureau of Geology and Mineral Exploration and Development,912 Brigade, Jiangxi Province Bureau of Geology and Mineral Exploration and Development,912 Brigade, Jiangxi Province Bureau of Geology and Mineral Exploration and Development,912 Brigade, Jiangxi Province Bureau of Geology and Mineral Exploration and Development,Hongfeng Exploration Co., Ltd.

Clc Number:

P634.7

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the previous construction situation of ZK5407 in Zhuxi mining area and according to the geological requirements of directional deviation correction, the general idea of directional deviation correction was determined. This paper introduces in detail the screw directional deviation correction technologies used 17 times in the segment from the hole depth of 1288.70m, angle 8.6 and azimuth 30 to the hole depth of 1637.25m, angle 2.7 and azimuth 257 , including the theoretical preparation, instrument and equipment, implementation process and drilling technology.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 30,2014
  • Revised:June 29,2015
  • Adopted:July 16,2015
  • Online: September 07,2015
  • Published: