On Drilling Construction in Broken Formation in Kaihua Waijidi Mining Area and the Study on Some Technical Problems
DOI:
CSTR:
Author:
Affiliation:

Zhejiang Province Non-ferrous Metal Geology Investigation Bureau,Zhejiang Province Non-ferrous Metal Geology Investigation Bureau,No.3 Geological Brigade, Hebei Bureau of Geology and Mineral Exploration

Clc Number:

P634.5

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In Waijidi mining area, the formation is complex with broken rocks. At the early stage of drilling construction, there is common existence of coring difficulties in shallow gossan type orebody, borehole curvature degree measuring, high requirements of environmental protection for flushing fluid preparation. Drilling scheme for complicated formation was made according to the geological and construction conditions, and based on the geological characteristics of exploration target, drilling process and operation were improved to meet the needs of geological work, enhance the reliability of the geological information and ensure the realization of mining exploration target.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 09,2015
  • Revised:April 24,2015
  • Adopted:June 01,2015
  • Online: July 03,2015
  • Published:
Article QR Code