Studies of Prevent Caving Drilling Mud in the Jinshan Tract
DOI:
Author:
Affiliation:

Petro Engineering Technology Research Institute, Northeast Oil & Gas Branch, SINOPEC,Petro Engineering Technology Research Institute, Northeast Oil & Gas Branch, SINOPEC,Petro Engineering Technology Research Institute, Northeast Oil & Gas Branch, SINOPEC,Petro Engineering Technology Research Institute, Northeast Oil & Gas Branch, SINOPEC,Petro Engineering Technology Research Institute, Northeast Oil & Gas Branch, SINOPEC

Clc Number:

P634.6

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Jinshan is hydrocarbon accumulation area chiefly, which have complex lithology and mudstone development. With long soak time of drilling mud, problems of wall stability are projecting. Be based on layer physics and chemistry and mechanics stability analysis, scarce chemistry stability of drilling mud which cause wall instability. To heighten wall stability,Proposeing first opinion of plugging prevent caving.Prepareing prevent caving drilling mud. The system have sealing and restrain characteristics powerfully. High temperature and pressure filtration can attain eleven millilitre under. Sand bed intrude into two centimeter. Mud shale rate of recovery can attain ninetyfive percent above, effect of drilling mud prevent caving marked are remarkably.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 12,2015
  • Revised:May 03,2015
  • Adopted:May 05,2015
  • Online: June 01,2015
  • Published: