Construction Technology for ZK2-6 in Pobei Mining Area of Xinjiang
DOI:
CSTR:
Author:
Affiliation:

NO.6 Geological Party, Xinjiang Bureau of Geology and Mineral Resources,NO.6 Geological Party, Xinjiang Bureau of Geology and Mineral Resources,NO.6 Geological Party, Xinjiang Bureau of Geology and Mineral Resources,NO.6 Geological Party, Xinjiang Bureau of Geology and Mineral Resources,NO.6 Geological Party, Xinjiang Bureau of Geology and Mineral Resources

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Multi-layer alteration zones were encountered in the construction of ZK2-6 in Pobei mining area of Xinjiang, the longest continuous intense alteration zone was 30m. In the previous construction, the property of mud with brine was hard to be ensured, which was unfavorable to the wall stability and often caused hole wall spalling, diameter oversizing and drill pipe breaking, even borehole was abandoned. According to the drilling problems in alteration zone, the related research was carried out to put forward corresponding technical measures to complete ZK2-6 in Pobei mining area.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 24,2015
  • Revised:July 28,2015
  • Adopted:August 04,2015
  • Online: September 07,2015
  • Published:
Article QR Code