Construction Technology of Brine Wells in Guyuan of Ningxia
DOI:
CSTR:
Author:
Affiliation:

Shandong Province Lubei Geology Project Reconnaissance Institute,Shandong Province Lubei Geology Project Reconnaissance Institute,Shandong Province Lubei Geology Project Reconnaissance Institute,Shandong Province Lubei Geology Project Reconnaissance Institute

Clc Number:

P634.5

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on geological survey, salt well technical parameters and requirements, drilling equipments, drilling technology and other aspects in the brine well in Guyuan of Ningxia, this paper introduces the brine well construction, focuses on the key technical measures of drilling fluid, cementing and butt construction, etc. and lists the outstanding issues appeared in the construction, such as clay mixing into drilling fluid, gypsum-containing shale necking collapse and sand setting in high angle wells segment, the processing methods are analyzed and the experiences and lessons of brine well construction are summarized.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 27,2016
  • Revised:June 13,2016
  • Adopted:August 08,2016
  • Online: December 07,2016
  • Published:
Article QR Code