Comparison Analysis on Water-stop Curtain Methods of TRD and Cut-off Wall for Ultra Deep Foundation Pit
DOI:
Author:
Affiliation:

Wuhan Geological Prospecting DdDd Foundation Engineering Co.,Ltd.,Wuhan Hubei

Clc Number:

TU473.2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The comparison analysis is made in detail on the wall by TRD method and cut-off wall by slot machine in construction cost, work efficiency, anti-seepage quality, environmental protection and consumptive material. The results show that cut-off wall is better than TRD method wall under the same conditions, which is an advanced and feasible waterproof construction technology and deserves popularization and application in the ultra deep foundation pit waterproof.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 24,2016
  • Revised:September 09,2016
  • Adopted:September 18,2016
  • Online: December 21,2016
  • Published: