Study on Defects Processing Technology of Ledge Beam Rock Bench for TBM Assemble Hole
DOI:
CSTR:
Author:
Affiliation:

Beijing Vibrofloatation Engineering Co., Ltd.

Clc Number:

TV554

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    During the construction process of TBM assemble hole ledge beam, because of the geological conditions and artificial influence factors, the ledge beam could not be formed or there would be some defects in rock bench of ledge beam, which were serious security risks to the next installation of crane track in upper part of ledge beam. With the research background of TBM assemble hole ledge beam of the 3rd contract section in main channel of transferring water from Songhuajiang River, the detailed analysis and study were carried out to put forward processing technology of ledge beam defects. The verified research results have some reference values to the similar project.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 21,2016
  • Revised:March 21,2016
  • Adopted:April 13,2016
  • Online: May 12,2016
  • Published:
Article QR Code