Application of SYZX96 Wire-line Coring Hydro-Hammer in Complex Strata of Gansu Liba Gold Mine and the Effects
DOI:
Author:
Affiliation:

Ningxia Nuclear Industry Geological Exploration Institute,Ningxia Nuclear Industry Geological Exploration Institute,NingXia NuCeal Industry Geological Engineering Bureau,Ningxia Nuclear Industry Geological Exploration Institute,Ningxia Nuclear Industry Geological Exploration Institute

Clc Number:

P634.5 6

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Strong water sensitive and broken formation was encountered in drilling construction in Liba gold mine of Southern Gansu, drilling by ordinary wire-line coring tool resulted in low core recovery and low drilling efficiency, the average core recovery rate was 86.5%, the footage per run was below 1 meter, the minimum was only 20~30cm and the average footage per team was about 5 meters. Good drilling efficiency has been achieved by using SYZX96 wire-line coring hydro-hammer, the average core recovery rate, average footage per run and average machine efficiency per month have been improved by 8%, 50% and 17.5% respectively; drilling time increased to about 60%. Based on the application situation, the paper elaborates SYZX96 wire-line coring hydro-hammer about its structure, working principle and the points for attention in operation.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 11,2016
  • Revised:May 16,2016
  • Adopted:May 23,2016
  • Online: June 16,2016
  • Published: