Key Technology of Anchor Cable Drilling Construction in High and Steep Slope of Changsha Ice and Snow World
DOI:
Author:
Affiliation:

Civil Engineering Co., Ltd., China Construction Fifth Engineering Bureau,School of Civil Engineering, Hunan University of Science & Technology,Civil Engineering Co., Ltd., China Construction Fifth Engineering Bureau,Civil Engineering Co., Ltd., China Construction Fifth Engineering Bureau,Civil Engineering Co., Ltd., China Construction Fifth Engineering Bureau,Civil Engineering Co., Ltd., China Construction Fifth Engineering Bureau

Clc Number:

P634.5;P642.22

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Unfavorable geological conditions were encountered in anchor cable construction for Changsha Ice and Snow World, it was difficult for drilling and hole completion. In view of the construction difficulties under poor geological conditions, the poor geological conditions evaluation basis were put forward, the treatment of pipe-sticking, hole collapse, water seepage, karst and fault were carried out in the drilling process with good effects.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 12,2016
  • Revised:August 26,2016
  • Adopted:September 05,2016
  • Online: November 22,2016
  • Published: