Construction Technology for Large Diameter Gas Drainage Borehole through Coalmine Gob Area
DOI:
Author:
Affiliation:

The 4th Team, Coalfield Geology Bureau of Henan Province

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In view of the technical difficulties existed in large diameter borehole through coalmine gob area, based on the large diameter gas drainage hole construction practice in Xinzhuangzi coalmine, the construction process, drilling technology and casing & cementing technologies were analyzed and discussed. The key construction technologies for large diameter gas drainage borehole in coalmine gob area were summed up, which can be used for reference in similar engineering.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 14,2016
  • Revised:June 15,2016
  • Adopted:August 26,2016
  • Online: November 22,2016
  • Published: