Abstract:In view of the technical difficulties existed in large diameter borehole through coalmine gob area, based on the large diameter gas drainage hole construction practice in Xinzhuangzi coalmine, the construction process, drilling technology and casing & cementing technologies were analyzed and discussed. The key construction technologies for large diameter gas drainage borehole in coalmine gob area were summed up, which can be used for reference in similar engineering.