    Abstract:

    Because of the large diameter of mine feeding well, grading reaming is adopted. The wear resistant pipe of feeding well has high stiffness and heavy weight, which has high requirements on borehole verticality, lifting equipments and appliances, serious safety or quality accidents often occur in the construction. Based on a series of engineering practices, with the case of a feeding well in Inner Mongolia, this paper summarizes the drilling completion construction technology of feeding well and the key points of control.

    Reference
    [1]彭金灶,等.矿山投料井施工难点与对策[J]. 探矿工程(岩土钻掘工程) . 2010,37(4):31-33.
    [2]翁家杰.井巷特殊施工[M].北京:煤炭工业出版社,2000.
    [3]杨建忠,等. 煤矿垂直投料井施工技术研究[J].煤Coal.2014,06:84-84.
    [4]王世光,等.钻探工程[M].北京:地质出版社,1987.
    [5]巨峰,等.充填采煤固体物料垂直投料井施工工艺研究[J].采矿与安全工程学报.2012,29(1):38-43.
    [6] 袁存发.煤矿大口径投料孔施工[J].建井技术.2016,37(1)11-13 17.
    [7] 程斌,等.地表充填投料孔扩井施工技术[J]. 现代矿业. 2013,29(7):79-82.
    [8] GB 50511-2010,煤矿井巷工程施工规范[S].
    Comments
    Comments
    分享到微博
    Submit
Get Citation
Share
Article Metrics
  • Abstract:1122
  • PDF: 1243
  • HTML: 214
  • Cited by: 0
History
  • Received:June 23,2016
  • Revised:November 14,2016
  • Adopted:November 24,2016
  • Online: February 20,2017
Article QR Code