Construction Technology and Key Points of Control for Feeding Well Drilling and Completion
DOI:
Author:
Affiliation:

Hebei Research Institute of Construction & Geotechnical Investigation Co. Ltd.,Hebei Research Institute of Construction DdDd Geotechnical Investigation Co. Ltd.,Hebei Research Institute of Construction DdDd Geotechnical Investigation Co. Ltd.

Clc Number:

P634.5;TD823.11

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Because of the large diameter of mine feeding well, grading reaming is adopted. The wear resistant pipe of feeding well has high stiffness and heavy weight, which has high requirements on borehole verticality, lifting equipments and appliances, serious safety or quality accidents often occur in the construction. Based on a series of engineering practices, with the case of a feeding well in Inner Mongolia, this paper summarizes the drilling completion construction technology of feeding well and the key points of control.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 23,2016
  • Revised:November 14,2016
  • Adopted:November 24,2016
  • Online: February 20,2017
  • Published: