Design of Combination Treatment Plan for Loess Landfall and the Engineering Construction
DOI:
CSTR:
Author:
Affiliation:

Shaanxi Geological Engineering Corporation,Shaanxi Geological Engineering Corporation,Shaanxi Geological Engineering Corporation

Clc Number:

P642.21

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Under the influence of long term rainfall and human activity, a high and steep loess slope on the mountain behind a residential area in Wuqi County has become hidden danger of geological disaster. The combination treatment plan of load decreasing soil nailing to strengthen the stability of slope was put forward. Combined with the actual situation, the parameters, process requirements and construction methods of level-by-level slope cutting and soil nailing support were designed respectively. In accordance with the construction plan, the slope has been effectively strengthened.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 18,2016
  • Revised:July 18,2016
  • Adopted:September 01,2016
  • Online: November 22,2016
  • Published:
Article QR Code