Borehole Completion Process of Cast-in-place Pile for Super High-rise Buildings in Fuzhou Riverside Area
DOI:
CSTR:
Author:
Affiliation:

Ganzhongnan Institute of Geology and Mineral Exploration

Clc Number:

TU473.1 4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Taking 2 representative prohect examples of super high-rise buildings in Fuzhou riverside area as the basis, by the process comparison of conventional percussion drilling normal circulation drilling, rotary drilling air lift reverse circulation drilling and rotary drilling pump suction reverse circulation drilling, some opinions are presented for the grouting pile drilling construction in thick layer of super large-size gravel and granite formation in Fuzhou riverside area, rotary drilling pump suction reverse circulation process is decided to be reliable.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 10,2016
  • Revised:April 03,2017
  • Adopted:May 11,2017
  • Online: July 21,2017
  • Published:
Article QR Code