Application of Drilling Technology of Horizontally Butted Well for Gas Hydrate Trial-producing
DOI:
Author:
Affiliation:

The Institute of Exploration Techniques, CAGS,The Institute of Exploration Techniques, CAGS,The Institute of Exploration Techniques, CAGS,The Institute of Exploration Techniques, CAGS,The Institute of Exploration Techniques, CAGS,The Institute of Exploration Techniques, CAGS,The Institute of Exploration Techniques, CAGS

Clc Number:

P634.7;TE243

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In 2016, trial-producing horizontally butted well of gas hydrate was carried out in permafrost area, Qilian Mountain. Reasonable drilling parameters and mud formula have been made according to the different well sections. Precise docking has been realized under small curvature radius by using the MWD technology and SmartMag target-hitting guide system. Drilling technology of horizontally butted well has been successfully applied to gas hydrate trial-producing and good results has been achieved. The drilling construction of horizontally butted well for gas hydrate trial-producing is different from that for dissolvable minerals, which requires a higher accuracy on connection and is also more difficult to be put into effect. This paper mainly introduces the drilling construction technology of horizontally butted well for gas hydrate trial-producing.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 12,2017
  • Revised:July 19,2017
  • Adopted:July 21,2017
  • Online: September 18,2017
  • Published: