Abstract:In recent years, concrete settlement, water emitting and sand exuding often appeared on the pile top concrete in the bored grouting piles construction and inspection processes in Wenzhou City, which seriously affected the engineering quality. From the view point of factors of environment, material and technology and combined with the bore grouting pile construction experience, the forming causes of the above mentioned phenomena are analyzed respectively and the relevant explanations are presented in this article, the correlation between these 3 phenomena is also explained.