Development of PA-10 Steel Pipe Column Mounting Machine and Its Application in New PBA Method
DOI:
CSTR:
Author:
Affiliation:

The Institute of Exploration Techniques, CAGS,The Institute of Exploration Techniques, CAGS,The Institute of Exploration Techniques, CAGS,The Institute of Exploration Techniques, CAGS,The Institute of Exploration Techniques, CAGS

Clc Number:

TU69

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The structure, performance parameters and automatic adjusting verticality principle of PA-10 steel pipe mounting machine, which is used in new PBA method, are discussed. Compared with the traditional PBA method, this new PBA method has the advantages of high efficiency, high precision of adjustable verticality, short construction period and high economic benefit. According to the steel pipe column construction case of Provincial Government station of Harbin metro Line 2, the measurement lofting result of the middle pile shows that the adjusting verticality accuracy meet the design requirements, which proves the successful development of PA-10 steel pipe mounting machine. By the application of PA-10 steel pipe mounting machine, the labor intensity of workers is reduced; and at the same time, both the construction safety coefficient and the construction quality are greatly improved, which has great significance for the development of subway station construction toward the mechanization and automation and is in line with the development trend of modern urban rail transit construction.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 24,2017
  • Revised:June 06,2017
  • Adopted:June 13,2017
  • Online: August 23,2017
  • Published:
Article QR Code