Abstract:The various complex formations with folds and faults development made the drilling construction very difficult in Baijian mining area, several drilling technologies are adopted, including ball-down single pipe drilling, PDC wire-line core drilling, drilling with casing and diamond wire-line core drilling. According to the different formation conditions, different slurry preparation schemes are adopted and flexibly used in the construction process with good construction effects and experience.