Construction Technology of Rock-socketed Pile in Miscellaneous Fill of Changbai Mountain Area
DOI:
Author:
Affiliation:

Inner Mongolia Geology and Mining〈Group〉

Clc Number:

TU473.1 4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Because of the complex composition, loose soil layers and low mechanical strength in miscellaneous fill site, pile foundation construction is difficult, especially for where being newly filled. With a case of bored cast-in-place pile constructed in miscellaneous fill of Changbai Mountain area, the impact drilling technology is selected after the analysis on the applicability of different holing methods. This paper introduces the construction process, difficulties and countermeasures as well as mud treatment, expounds the construction technology of rock-socketed piles in thick-layer miscellaneous fill site.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 09,2018
  • Revised:January 09,2018
  • Adopted:March 13,2018
  • Online: April 25,2018
  • Published: