Application of High Position and Long Directional Drilling Technology for Gas Control in Goaf of Taoyuan Coal Mine
DOI:
CSTR:
Author:
Affiliation:

Xi’an Research Institute of China Coal Technology & Engineering Group Corporation,Xi’an Research Institute of China Coal Technology & Engineering Group Corporation,Xi’an Research Institute of China Coal Technology & Engineering Group Corporation

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Aiming at the conundrum of goaf gas excess after working face mining, 3 long-distance coal seam roof large diameter directional borehole were constructed in 1029 working face of Taoyuan mine by using the directional drilling technology combined screw motor with MWD, the maximum hole depth is 531m and the cumulative footage 1701m(contains branch holes). Through the precise control of drilling trajectory, the borehole is extended along the crack zone of the coal seam roof, the gas in the goaf is effectively extracted after the coal seam mining. This paper summarizes a set of drilling construction methods of high position and long borehole in roof for gas control in the goaf to ensure the safe and efficient production of coal mines.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 07,2018
  • Revised:February 07,2018
  • Adopted:May 17,2018
  • Online: August 07,2018
  • Published:
Article QR Code