Casing RIH Difficulties and Improvement Measures for Horizontal Wells in Western Sichuan Province
DOI:
Author:
Affiliation:

Cementing Company of Sinopec Xinan Oilfield Service Corporation,Cementing Company of Sinopec Xinan Oilfield Service Corporation,Cementing Company of Sinopec Xinan Oilfield Service Corporation,Cementing Company of Sinopec Xinan Oilfield Service Corporation

Clc Number:

TE256 .2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    During the drilling and well completion process, sticking often occurs when casing is run into the horizontal section during RIH of casing, and in some extreme cases casing may be tightly stuck. It is much more serious in western Sichuan due to relatively complex geological conditions. Analysis of some typical sticking cases and their causes leads to the following conclusion: there are 2 main types of sticking: sudden sticking and sticking due to increasing resistance; and the relevant improvement measures are put forward.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 05,2018
  • Revised:August 21,2018
  • Adopted:September 26,2018
  • Online: December 06,2018
  • Published: